{"id":19993,"date":"2014-03-02T21:37:40","date_gmt":"2014-03-02T13:37:40","guid":{"rendered":"http:\/\/www.chekyang.com\/musings\/?p=19993"},"modified":"2017-02-25T14:03:16","modified_gmt":"2017-02-25T06:03:16","slug":"the-minton-ideas-and-renovation-16-renovation-begins","status":"publish","type":"post","link":"https:\/\/www.chekyang.com\/musings\/2014\/03\/02\/the-minton-ideas-and-renovation-16-renovation-begins\/","title":{"rendered":"The Minton: Ideas and Renovation \u2013 16 \u2013 Renovation Day 3"},"content":{"rendered":"<p>Our Minton renovation project finally started on the 28 Feb Friday &#8211; exactly 7 weeks after key collection. Defect rectification is still ongoing though with a few more issues to resolve, but these concerns areas that aren&#8217;t affected by the main renovation, so we allowed the defect team to finish these concurrently. Looking at our projected timeline from earlier this year, we&#8217;re about late by a fortnight &#8211; we&#8217;d initially planned for the project to start in mid-February and allow for up to 6 weeks for it to complete, and for us to begin the laborious process of slowly moving bit by bit from the start of April. Our designer has advised that our project will complete latest by mid-April, but will try to get it done by the end of March.<\/p>\n<p>We checked out our unit this morning &#8211; Day 3 of the project. The house&#8217;s flooring has been laid over by what seems two-layered protection. Some sort of bubble-based wrap as the base layer, and another cardboard layer sitting on top of it. Two stacks of <a href=\"http:\/\/www.craftstone.com.sg\/\">craftbrick<\/a> boxes have also been bought into our unit too, which I assume is to mean that the craftbrick wall will be among the first items to get installed, alongside the first electrical works to begin this coming Monday. The door frame in the yard toilet has also been removed to make way for our washer and dryer stack that will be going into the yard toilet.<\/p>\n<figure id=\"attachment_19994\" aria-describedby=\"caption-attachment-19994\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-19994\" src=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030938-renovation-start.jpg\" alt=\"Cardboard protection everywhere.\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030938-renovation-start.jpg 550w, https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030938-renovation-start-270x180.jpg 270w, https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030938-renovation-start-300x200.jpg 300w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><figcaption id=\"caption-attachment-19994\" class=\"wp-caption-text\">Checking out the unit &#8211; not much to see though at the moment.<\/figcaption><\/figure>\n<figure id=\"attachment_20000\" aria-describedby=\"caption-attachment-20000\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-20000\" src=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030945-renovation-start.jpg\" alt=\"4 week renovation f\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030945-renovation-start.jpg 550w, https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030945-renovation-start-270x180.jpg 270w, https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030945-renovation-start-300x200.jpg 300w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><figcaption id=\"caption-attachment-20000\" class=\"wp-caption-text\">Cardboard protection everywhere.<\/figcaption><\/figure>\n<figure id=\"attachment_19995\" aria-describedby=\"caption-attachment-19995\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-19995\" src=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030941-renovation-start.jpg\" alt=\"22 boxes of these stacked in the living room.\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030941-renovation-start.jpg 550w, https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030941-renovation-start-300x200.jpg 300w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><figcaption id=\"caption-attachment-19995\" class=\"wp-caption-text\">22 boxes of these stacked in the living room.<\/figcaption><\/figure>\n<figure id=\"attachment_19999\" aria-describedby=\"caption-attachment-19999\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-19999\" src=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030942-renovation-start.jpg\" alt=\"Installation instructions for the craftstone bricks.\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030942-renovation-start.jpg 550w, https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030942-renovation-start-300x200.jpg 300w\" sizes=\"auto, (max-width: 550px) 100vw, 550px\" \/><figcaption id=\"caption-attachment-19999\" class=\"wp-caption-text\">Installation instructions for the craftbricks.<\/figcaption><\/figure>\n<figure id=\"attachment_19996\" aria-describedby=\"caption-attachment-19996\" style=\"width: 320px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-19996\" src=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030952-renovation-start.jpg\" alt=\"Door-frame removed from the yard toilet. The basin and showerhead is remaining though.\" width=\"320\" height=\"479\" srcset=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030952-renovation-start.jpg 320w, https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030952-renovation-start-200x300.jpg 200w\" sizes=\"auto, (max-width: 320px) 100vw, 320px\" \/><figcaption id=\"caption-attachment-19996\" class=\"wp-caption-text\">Door-frame removed from the yard toilet. The basin and showerhead is remaining though.<\/figcaption><\/figure>\n<figure id=\"attachment_19997\" aria-describedby=\"caption-attachment-19997\" style=\"width: 320px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-19997\" src=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030956-renovation-start.jpg\" alt=\"Mommy, Peter and Hannah on a sunny Sunday morning @ The Minton!\" width=\"320\" height=\"480\" srcset=\"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030956-renovation-start.jpg 320w, https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030956-renovation-start-200x300.jpg 200w\" sizes=\"auto, (max-width: 320px) 100vw, 320px\" \/><figcaption id=\"caption-attachment-19997\" class=\"wp-caption-text\">Mommy, Peter and Hannah on a sunny Sunday morning @ The Minton!<\/figcaption><\/figure>\n<p>More notes to come in the next couple of days.:)<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Our Minton renovation project finally started on the 28 Feb Friday &#8211; exactly 7 weeks after key collection. Defect rectification is still ongoing though with a few more issues to resolve, but these concerns areas that aren&#8217;t affected by the<\/p>\n<div class=\"entry-read-more\"><a class=\"read-more-link\" href=\"https:\/\/www.chekyang.com\/musings\/2014\/03\/02\/the-minton-ideas-and-renovation-16-renovation-begins\/\">Read More<span class=\"cleanwp-sr-only\">  The Minton: Ideas and Renovation \u2013 16 \u2013 Renovation Day 3<\/span><\/a><\/div>\n","protected":false},"author":1,"featured_media":20000,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[526],"tags":[515,337],"class_list":["post-19993","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-home","tag-minton","tag-renovation","wpcat-526-id"],"jetpack_featured_media_url":"https:\/\/www.chekyang.com\/musings\/wp-content\/uploads\/2014\/03\/blog-2014-minton-P1030945-renovation-start.jpg","_links":{"self":[{"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/posts\/19993","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/comments?post=19993"}],"version-history":[{"count":0,"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/posts\/19993\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/media\/20000"}],"wp:attachment":[{"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/media?parent=19993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/categories?post=19993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.chekyang.com\/musings\/wp-json\/wp\/v2\/tags?post=19993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}